Installation
VEE-R Studio address products use one of two primary mounting methods: architectural standoffs or low-profile adhesive mounting. The product listing identifies the intended method for the design you purchase.
Standoff-mounted signs
Use the supplied layout or installation guide to position the sign level and mark mounting locations before drilling. Confirm the wall construction and use anchors or fasteners appropriate for the mounting surface.
Adhesive-mounted designs
Install only on a clean, dry, stable surface suitable for exterior adhesive. Test placement before removing the adhesive liner because repositioning may reduce bond strength.
Before installation
Confirm spacing, level, visibility from the street, and clearance around doors, trim, siding joints, masonry edges, and electrical fixtures. If you are unsure about drilling into your exterior, use a qualified installer.